The Future of Multisim is on the Desktop. On September 15, 2026, the Multisim Live online simulator will be shut down. Read more about this transition here
Your browser is incompatible with Multisim Live. Use the Chrome™ browser to best experience Multisim Live.
SQUID with trafoR and intermediate Transformer (1)
The first transformer injects flux into the loop.
The loop has dissipation through a transformer.
The indcutance L1 does the job of the SQUID since the probe measures the voltage over L1.
The second transformer is weakly coupled to an LC resonator. The question is whether the circle and the offset are perpendicular to each other
There are currently no comments