The Future of Multisim is on the Desktop. On September 15, 2026, the Multisim Live online simulator will be shut down. Read more about this transition here
Your browser is incompatible with Multisim Live. Use the Chrome™ browser to best experience Multisim Live.
using 8W / m 1m LED strips in parallel to get an idea of the circuit load (without a control board individually controlling the intensity / timing of each stair to get an idea of PEAK Power required for the AC/DC unit & ratings required for the motion sensors
There are currently no comments